Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 02/01/2023:

  • Block C1, C2, C3: Floor 1-9: 100%; Floor 10: 75%; Floor 11: 50%; Floor 12: 30%
  • Block D1, D2, D3: Floor 1-9: 100%; Floor 10: 70%