Developer News Updated: 17/04/2023

Construction progress update of The Habitat Binh Duong – Phase 3 as at 15 Apr 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 15/04/2023:

  • Block C1, C2, C3: Floor 1-14: 100%; Floor 15: 70%; Floor 16: 40%; Floor 17: 30%; Floor 18: 30%
  • Block D1, D2, D3: Floor 1-14: 100%; Floor 15: 70%