Developer News Updated: 16/12/2022

Construction progress update of The Habitat Binh Duong – Phase 3 as at 15 December 2022

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 15/12/2022:

  • Block C1, C2, C3: Floor 1-8: 100%; Floor 9: 75%; Floor 10: 50%; Floor 11: 30%
  • Block D1, D2, D3: Floor 1-8: 100%; Floor 9: 30%