Developer News Updated: 15/02/2023

Construction progress update of The Habitat Binh Duong – Phase 3 as at 15 Feb 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 15/02/2023:

  • Block C1, C2, C3: Floor 1-11: 100%; Floor 12: 75%; Floor 13: 40%; Floor 14: 30%