Construction progress update of The Habitat Binh Duong – Phase 3 as at 15 September 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 15/09/2023:

I. Building Structure: Completed

II. Finishing Part:

  • Block C1, C2, C3

Building wall : F3-F17

Plastering: F2-F10

  • Block D1, D2, D3

Building Wall: F3-F15

Plastering: F5-F7