Developer News Updated: 16/01/2023

Construction progress update of The Habitat Binh Duong – Phase 3 as at 16 Jan 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 16/01/2023:

  • Block C1, C2, C3: Floor 1-10: 100%; Floor 11: 75%; Floor 12: 50%; Floor 13: 30%
  • Block D1, D2, D3: Floor 1-10: 100%; Floor 11: 30%