Developer News Updated: 05/09/2023

Construction progress update of The Habitat Binh Duong – Phase 3 as at 31 August 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 31/08/2023:

I. Building Structure: Completed

II. Finishing Part:

  • Block C1, C2, C3

Building wall : F3-F16

Plastering: F2-F7

  • Block D1, D2, D3

Building Wall: F3-F14

Plastering: F5-F6