Developer News Updated: 31/03/2023

Construction progress update of The Habitat Binh Duong – Phase 3 as at 31 Mar 2023

Construction status of The Habitat Binh Duong project – Phase 3 is updated as at 31/03/2023:

  • Block C1, C2, C3: Floor 1-13: 100%; Floor 14: 70%; Floor 15: 45%; Floor 16: 30%; Floor 17: 30%
  • Block D1, D2, D3: Floor 1-13: 100%; Floor 14: 75%